Project Background

The Project channel reach is currently an earthen trapezoidal leveed section originally designed to convey 65% of the 25-year storm. The Project consists of a series of design elements necessary for the channel reach to meet current design criteria to convey a 100-year storm event, as well as meet federal requirements for national flood insurance.

The project design includes, but is not limited to, the following elements:

  1. Dual-row steel sheet piles installed via the press-in method on each side of the channel
  2. Deep soil-cement mix columns and a maintenance road constructed between the channel side sheet piles and land side sheet piles
  3. Channel widening by removing the resultant trapezoidal channel soil wedge, and;
  4. Water quality Best Management Practices (BMPs).

before and after

Project Location

arial

Project Timeline

project timeline

Project Events

Virtual Community Meeting

Date:  Thursday, July 30, 2020  |  6:00 pm – 7:00 pm

Meeting topics:

  • Need for flood channel improvements
  • Project schedule
  • Types of improvements to enhance flood protection
  • Construction activities
  • Question & answer portion

How to attend the July 30, 2020 virtual community meeting:

To view the online meeting and presentation on a computer or smartphone, visit:
www.OCPublicWorks.com/HBFloodProject
 
To only listen to the meeting on a phone without viewing the presentation, dial:
1-415-655-0001 
Access Code: 133 203 6633

Email Updates

Would you like to stay informed as we move things along? sign up Sign-up to receive email updates.

Contact Information

Project Contact:  Shannon Widor 

phone icon714.667.9759  |  email icon ProjectInfo@ocpw.ocgov.com

facebook icon   facebook.com/ocpublicworks/       twitter iconTwitter: @OCpublicworks  |  instagram logo instagram.com/ocpublicworks/