OCGov.com - Orange County - Our Community Out Commitment Directors Name Jess Carbajal Contact the County Orange County Seal
ocpw header banner
Orange County Road
Traffic comments and Concerns
  • Access ramp on Washington and Adams Street
    Access ramp on Washington and Adams Street
    Access ramp on Washington and Adams Street
  • Alley @ Jackson Street
    Alley @ Jackson Street
    Alley @ Jackson Street
  • Alley west of Adams Street - soil sterilent
    Alley west of Adams Street - soil sterilent
    Alley west of Adams Street - soil sterilent
  • MCatch Basin
    Catch Basin
    Catch Basin
  • Crossgutter at Bolsa Ave
    Crossgutter at Bolsa Ave
    Crossgutter at Bolsa Ave
  • Curb & Gutter
    Curb & Gutter
    Curb & Gutter
  • East of Jackson alley 10
    East of Jackson alley 10
    East of Jackson alley 10
  • Inlet Structure catch basin
    Inlet Structure catch basin
    Inlet Structure catch basin
  • Jefferson Water Drop 02
    Jefferson Water Drop 02
    Jefferson Water Drop 02
  • Line B RCB-Monroe 8
    Line B RCB-Monroe 8
    Line B RCB-Monroe 8
  • Line B RCP-Monroe 9
    Line B RCP-Monroe 9
    Line B RCP-Monroe 9
  • Pervious Concrete Jackson 2
    Pervious Concrete Jackson 2
    Pervious Concrete Jackson 2
  • Previous Concrete Jackson
    Previous Concrete Jackson
    Previous Concrete Jackson
  • Sidewalk replacement
    Sidewalk replacement
    Sidewalk replacement
  • South West Adams-Wash
    South West Adams-Wash
    South West Adams-Wash
  • Van Buren sidewalk
    Van Buren sidewalk
    Van Buren sidewalk
  • Water Drop Washington trench
    Water Drop Washington trench
    Water Drop Washington trench
  • Water Drop Washington
    Water Drop Washington
    Water Drop Washington

................................................................................................................................................................

OC Road Midway City


Midway City Street & Storm Drain Improvements

Midway City Street & Storm Drain Improvements

Here are the updates for the Midway City Street and Storm Drain Improvement Project for August 2011:

  • Storm drains:
    • Storm drain installations continue on the following streets:
      • Monroe Street from Washington Avenue to Roosevelt
      • Madison Avenue from Monroe Street to Wilson Street
      • Roosevelt Avenue from Van Buren Street to Wilson Street

  • Street Improvements
    • Street improvement concrete work (curb & gutter, sidewalk, and drive approaches) installations have begun on the following streets:
      • Harper Street from Washington Avenue to Roosevelt Street
      • Monroe Street from Bolsa Avenue to Washington Avenue
      • Van Buren Street from Madison Avenue to Roosevelt Avenue

    • The asphalt concrete base pavement has been placed on the following streets:
      • Hazard Avenue from M Street to Wilson Street
      • Jackson Street from Madison Avenue to Roosevelt Avenue
      • Jefferson Street from Roosevelt Avenue to Hazard Avenue

  • Replacement of trees, sprinklers and grass
    • The installation of replacement trees is taking place on various streets.
    • The replacement of existing sprinklers in the parkway areas continues on various streets.
    • The installation of grass for parkways will begin the last week in August.

  • The project remains on schedule with a projected completion date for July 2012.  If you have any questions, please contact the following County Personnel:
    • Webster Labrador – Senior Construction Inspector
      • Cell phone (714) 936-5639
    • Michael Hatch – Senior Construction Inspector
      • Cell phone (714) 448-9529
    • Carlos Lopez – Supervising Construction Inspector
      • Office phone: (714) 245-4512
      • Cell phone: (714) 448-6251
    • Bob Valle – Administrative Manager I
      • Office phone: (714) 245-4525
      • Cell phone (714) 856-4598

Important Reminder!

Residents are reminded to observe “no parking signs” and to drive slowly while traveling in construction zones to protect the contractor’s workers. It is the Department’s sincere desire to accomplish this much-needed construction with minimum inconvenience to the area’s residents. Your cooperation is appreciated. Please remember that construction sites present many challenges. Please instruct children to stay away from construction activity at all times.

Past Updates:

  1. Midway City Updates as of October 2011
  2. Midway City Updates as of August 2011
  3. Midway City Updates as of July 2011
  4. Midway City Updates as of April 25, 2011
  5. Midway City Updates as of March 16, 2011
  6. Midway City Community Meeting Minutes: November 18, 2010
  7. October 22, 2010 Press Release: Community Meeting Addresses Upcoming Midway City Street and Storm Drain Improvement Project

 

 

Road Sections
a
  • Road Projects Photo Gallery: